As students came back to campus for the Fall 2014 semester, several renovations had been completed. These renovations included the cafeteria, Pryor-England Science building and Armstrong residence hall.
As students came back to campus for the Fall 2014 semester, several renovations had been completed. These renovations included the cafeteria, Pryor-England Science building and Armstrong residence hall.